OPEN HOUSE MATERIALS - FACILITY PROJECTS
a. Police Department
b. DPW Facility
OPEN HOUSE MATERIALS
- February 16, 2023 - Open House Station Boards
- February 25, 2023 - Open House Station Boards
- Site Significance (attached)
- BFI Furniture Budget (attached)
- BFI Furniture Presentation (attached)
- FH Community Center Furniture Layout
- Brian Meade Cost Analysis
- Original FHPD/FHCC Cost Estimate
- Code Analysis for FHPD & FHCC
- FHCC Community Center Program Requirement
- FHPDOAA Acoustical Recommendation Report - 05/16/2023
SOLAR FEASIBILITY STUDY REPORT
Assessment of Project Development & Potential Benefits to utilizing Solar Energy
The buildings included in this study are:
1. Police Department
2. Department of Public Works
3. Borough Hall and Library
4. Concession Stand
FAIR HAVEN DEPARTMENT OF PUBLIC WORKS
- CTE Assessment (attached)
- Current Architectural (attached)
- Current Site Design Iterations Version 1 (attached)
- Current Site Design Iterations Version 2 (attached)
- Cost Estimate - DPW Garage Renovation - 10/07/2022
- Cost Estimate DPW Garage New Butler Building - 11/17/2022
- Cost Estimate DPW Garage New Butler Building - 12/20/2022
OPEN HOUSE - SECTION 1
STATIONS BOARDS
- An aerial map of the existing site showing its location within the neighborhood
- Two conceptual site plans for the Department of Public Works site.
- Different Fencing options for around Department of Public Works site
- Conceptual Building Floor Plans of the Department of Public Works Building
- Conceptual Building Elevations of the Department of Public Works Building